info@vexoraengineering.org + 966-52-9462488
GCC Region
HOME / PORTFOLIO

PROJECT PORTFOLIO

A selection of our engineering, safety and technical projects demonstrating the breadth of our capabilities across industrial sectors and complex operating environments.

CASE STUDIES

ASSET INTEGRITY PROJECTS

ASSET INTEGRITY — RBI
📊

RBI PROGRAMME — REFINERY STATIC EQUIPMENT

Development of a comprehensive risk-based inspection programme for critical static equipment, supporting inspection optimisation and asset reliability.

SECTOR Downstream
LOCATION GCC Region
DURATION 12 Months
ASSET INTEGRITY — PIPELINE
🔧

PIPELINE INTEGRITY MANAGEMENT

Full integrity programme covering pipeline inspection, anomaly assessment, corrosion management and maintenance strategy development.

SECTOR Oil & Gas
LOCATION Middle East
DURATION 10 Months
ASSET INTEGRITY — SLE
🏛️

STRUCTURAL LIFE EXTENSION — OFFSHORE PLATFORM

Structural integrity assessment and life-extension study for ageing offshore infrastructure including fatigue and remaining-life evaluation.

SECTOR Offshore
LOCATION Arabian Gulf
DURATION 5 Months
CASE STUDIES

HSE & PROCESS SAFETY PROJECTS

PROCESS SAFETY — HAZOP
🔬

FULL-PLANT HAZOP STUDY — GAS FACILITY

Full HAZOP assessment covering process systems, operating scenarios, safeguards and action tracking for a major gas processing facility.

SECTOR Upstream
LOCATION GCC
DURATION 6 Months
PROCESS SAFETY — QRA
📐

QRA & FERA — PETROCHEMICAL COMPLEX

Quantitative risk assessment and fire/explosion risk analysis supporting layout verification, mitigation and emergency planning.

SECTOR Petrochemicals
LOCATION Middle East
DURATION 5 Months
HSE — COMAH
📋

COMAH SAFETY REPORT — LNG FACILITY

Preparation of a COMAH-style safety report including hazard identification, consequence assessment, emergency planning and risk controls.

SECTOR LNG / Energy
LOCATION GCC
DURATION 8 Months
CASE STUDIES

ENGINEERING & ENVIRONMENTAL PROJECTS

ENGINEERING — FEED
📐

FEED & CONCEPTUAL DESIGN — GAS PROCESSING EXPANSION

Front-end engineering and conceptual design support for gas processing expansion, utilities and associated infrastructure.

SECTOR Upstream
LOCATION GCC
DURATION 6 Months
ENGINEERING — DIGITAL TWIN
🖥️

AS-BUILT 3D LASER SCANNING — PETROCHEMICAL PLANT

Laser scanning and digital modelling programme to improve engineering accuracy, planning and brownfield modification activities.

SECTOR Petrochemicals
LOCATION GCC
DURATION 3 Months
ENVIRONMENTAL — EIA
🌍

ENVIRONMENTAL IMPACT ASSESSMENT — INDUSTRIAL FACILITY

Environmental impact assessment covering baseline conditions, emissions, noise, waste and mitigation requirements.

SECTOR Industrial
LOCATION Middle East
DURATION 7 Months
CASE STUDIES

FIELD SAFETY & TRAINING PROJECTS

FIELD HSE
🦺

CONSTRUCTION HSE MANAGEMENT — LNG TERMINAL

HSE management support for major construction activities including supervision, monitoring and contractor coordination.

SECTOR LNG / Energy
LOCATION GCC
DURATION 18 Months
TRAINING — ISO
🎓

ISO 55001 IMPLEMENTATION — UTILITY OPERATOR

Implementation support for an asset management system aligned with ISO 55001 including awareness, procedures and internal auditing.

SECTOR Utilities
LOCATION GCC
DURATION 9 Months
TRAINING — PROCESS SAFETY
⚠️

HAZOP CHAIRMAN TRAINING — MAJOR OPERATOR

Specialist leadership training covering facilitation, HAZOP methodology, workshops, reporting and practical engineering scenarios.

SECTOR Oil & Gas
LOCATION GCC
DURATION 3 Days

LET'S DISCUSS YOUR PROJECT

Contact our team to explore how Vexora Engineering can support your organisation.